Samples and instruments can’t be replaced
Lab moves rarely fail in transit. They fail when a freezer loses temperature, a sample loses its chain of custody, or an instrument can’t be requalified on schedule.
Your research can’t restart from zero. Samples, instruments, and data have to arrive exactly as they left.
Your lab manager is protecting work in progress, and EHS is tracking chemical and biological materials. Facilities is preparing the new space, and instrument vendors need to be scheduled to requalify equipment.
JK coordinates all of them under one plan and schedules every step backward from the day your lab is running again.
Lab moves rarely fail in transit. They fail when a freezer loses temperature, a sample loses its chain of custody, or an instrument can’t be requalified on schedule.
Each move draws only on the services it needs, coordinated under one plan.
Pre-move planning, disassembly, packing, and setup for labs of any size. Work in progress is protected with custom crates and anti-static materials.
Chemical, biological, and specimen materials packed and segregated by DOT hazard class. Specialty vendors are managed under the same plan as the rest of the move.
Imaging systems, diagnostic units, and calibration-sensitive instruments moved in coordination with your biomedical engineers and OEM technicians.
Equipment removal, recycling, and secure shredding for vacated lab space. Decommissioning and recommissioning are coordinated with your team and vendors.
Secure storage for lab furniture, equipment, and records during phased moves, buildouts, and swing-space periods. Items are delivered when the space is ready.
One plan, built around the day your lab is running again.
Equipment, work in progress, and chemicals are inventoried and sequenced with your lab manager and EHS before anything moves.
Custom crates, anti-static materials, and specialized packing are matched to each instrument and sample type.
Every asset is tracked and documented from pickup to placement.
Equipment is installed per your floor plan, and vendor visits are scheduled so your team can restart work quickly.
Moving a lab against a lease or buildout date? Talk to a JK project lead about a plan built backward from the day your lab needs to be running. Get a quote
JK moved more than 2.7 million tissue slides from 12 locations into one filing system, finishing a three-month project in six weeks.
From biotech campuses to research hospitals and university labs, JK runs lab relocations across the country.