Engaged IT Managers Are Key to a Successful Office Move
STERLING, Va. (November 23, 2026) – JK Moving Services, the largest independently owned and operated moving company in North America, has released a checklist to help companies and their IT managers prepare for an office move. Planning matters: more than 90% of mid-size and large enterprises say a single hour of downtime costs them over $300,000, according to ITIC’s 2024 Hourly Cost of Downtime Survey, and an office move is one of the few times a company deliberately takes its systems offline.
“For a business, downtime means lost productivity and lost revenue, and an office move is a built-in source of it,” said David Cox, President, JK Moving Services. “What separates a smooth relocation from a disruptive one is planning, especially when it comes to moving technology.”

JK’s checklist for IT managers preparing for a move:
1. Start with a complete office IT inventory
Build a full, accurate inventory of everything that is moving, including workstations, monitors, network switches, phone systems, printers, and every server and piece of networking equipment in the building. Audit the physical network as well, so the baseline is fully documented and re-cabling can be completed efficiently at the new space. Skipping this step is one of the most common reasons IT relocations run over budget or behind schedule.
2. Build a realistic IT relocation project plan
Build the project plan around that inventory, and start early. Most IT relocations need at least three months of lead time, and longer if new cabling, ISP installation, or a hardware refresh is involved. Assign an owner to each phase so nothing falls into the gap between the IT and facilities teams.
3. Coordinate vendors, ISPs, and network infrastructure early
Internet and telecom providers are usually the longest lead-time item in an office move and the easiest to underestimate. If you are moving into a previously occupied office, contact ISP and telecom vendors at least two months before the move date to confirm installation windows, and evaluate the new location’s cabling and server room readiness before move day, not after. In new construction, it can take up to a year for an ISP to light the building.
4. Back up data and secure decommissioned equipment
Before anything is unplugged, create two full backups of critical systems and data, and transport and store them separately from the primary equipment. If the move includes retiring old hardware, plan for compliant data destruction and e-waste disposal at the same time. Review the lease on the current space, too: landlords frequently require tenants to restore the space to its original condition, which can mean removing network cabling, replacing ceiling tiles where wireless access points or other overhead equipment were installed, and repairing walls and doors.
5. Coordinate IT, facilities, and the moving team
IT and facilities teams should coordinate on packing and labeling, and IT should be part of the planning process from the start to help set the schedule and ensure enough staff are available to meet the organization’s needs. Every item that is moving needs a label, including furniture, computers, boxes, chairs, artwork, and trash cans. The moving company assigns each office, workstation, work room, and open area a unique move number so that every asset, including IT equipment, ends up where the floor plan says it should.
6. Test everything before calling the move complete
On move-in day, power everything on, test network connectivity end to end, confirm phone systems and printers are working, and verify that backed-up data is accessible before releasing the move team from the new space. Build this testing window into the project timeline.
7. Choose an office IT relocation partner for the physical move
Select a moving partner whose office IT relocation and decommissioning services cover the full scope of the move, from end-user disconnects and reconnects to secure server moves and AV requirements.
ABOUT JK MOVING SERVICES
For more than 40 years, JK Moving Services, the largest independently owned and operated moving company in North America, has provided local, long-distance, and global relocation services to commercial, residential, and government clients. Headquartered in Sterling, Virginia, and named Independent Mover of the Year by the American Trucking Associations, the company maintains a full-time, professionally trained staff of relocation and move management experts committed to providing the highest level of customer care. www.JKMoving.com